Instructions: Fill out form in as much detail as possible. The form operates like a standard spreadsheet, totalling your input as you go. The total cost appears at the very bottom of the form.
1.Style
2. Size
1. Cost / Pay off
2. Survey
3. Miscellaneous
1. Clearing (Cut Trees)
2. Stumping (Boulders)
3. Excavation
4. Blasting
5. Backfill
6. Utility Trenching (Elec. / Phone/ Cable) <100'
7. Driveway
a. Paving
b. Gravel
8. Landscaping
a. Grade & Loam 25' Perimeter
b. Seed (25'Perimeter)
c. Design
d. Plants, Trees, Bark Mulch
9. Permit
10. Miscellaneous
1. Sewerage
a. Town Sewer
Trenching
Hook ups
Fees (Permits)
b. Septic System
Soil Test
Septic Design
Permit
Excavation/Installation
2. Water
a. Town Water
Hook ups (Gate or Check)
Fees
b. Well Drilled 200' Allowance
Dug
Pump
Pressure Tank
Hook up
3. Electricity
a. Permit
b. Poles/Trenching
c. Service Surcharge
d. Trim Package (Mast)
Electrical Disonnect (if 3' or more from panel box)
e. Complete Home Hook-ups
Mount Panel
Complete Crossovers
Basement lights
Attic lights
Boiler wire
Pump Wire
4. Heating / Plumbing
a. Boiler / Furnace
b. Oil / Gas tank
c. Chimney / Power vent
d. Hot and Cold water hook-ups
e. Sewer drain Hook-ups
f. Permit
g. Washer / Dryer Hook-up
5. Miscellaneous
1. Foundation Wall
Length Width Height Thickness?
2. Crushed Stone
3. Floor Thickness
a. Chimney Pad
4. Perimeter &/or Floor drains
5. Sealer/Damp Proof
6. Steel Beam
7. Sill Seal Insulation
8. Sill Plates
9. Wooden Kneewall
Windows / Shutters
Siding & Soffit
10. Insulate First Floor (Perimeter)
Insulate First Floor (Full)
11. Bulk Head / Dog House
12. Basement Windows
13. Basement Doors
14. Miscellaneous
1. Stairs Basement incl.
Other
2. Steps W L H
3. Porches W L
4. Decks W L
5. Fireplaces / Hearths
6. Complete 2nd Floor Per Plan
7. Cape Cage Only
8. Garage H W
9. Miscellaneous
1. Transfer Fee
2. Deed
3. Title Search
4. Appraisal
5. Title Insurance
6. Financing
7. Insurance
8. Taxes
9. Points